• Manufacturer since 2010
  • SGS audited supplier · Ref. QIP-ASI251198
  • MOQ from 200 pcs · OEM / ODM welcome

Talk to a human, not a form.

+86 150 1755 3138
xuboyuan1688@163.com

Inside the J-Rong factory in Foshan, China

600 m² of production space, 3 automated assembly lines, 20 machines and 50 people — manufacturing lithium-ion phone batteries since 2010. Everything on this page was photographed on our own floor.

2010Manufacturing since
600,000Pieces per year
3 + 20Assembly lines & machines
50People on site
Our story

Fifteen years of doing one thing: phone batteries

Foshan Jurong New Energy Technology Co., Ltd. was established in 2010 at Beihai Science Park in Dali Town, Nanhai District, Foshan — the industrial belt that supplies much of China's consumer electronics aftermarket.

We started on domestic orders and still serve the Chinese market, which is why our quality bar is set by the most demanding repair market in the world. Since 2020 we have exported directly, and we now serve distributors and brand owners in Russia, India, Saudi Arabia, the United Arab Emirates, Nigeria and Vietnam.

We are vertically integrated from raw material procurement through to final shipment. That means one company is responsible for the cells that go in, the testing in the middle and the carton that arrives — not three suppliers blaming each other.

Michael Hui, Founder & General Manager of Foshan Jurong New Energy Technology Co., Ltd.

“We are a factory, not a middleman. Send me your model list and I will personally make sure the price and the quality are right.”

Michael Hui

Founder & General Manager · Foshan Jurong New Energy Technology Co., Ltd.

Quality control

Four gates before a battery reaches your carton

Quality is not a final inspection at this factory — it is four checks placed along the line. Any unit that fails is pulled, not repackaged.

  • Incoming screening — cells measured for capacity, voltage and consistency before release to production.
  • In-process monitoring — station-level logging across clipping, labelling and printing.
  • Two testing stations — first test after assembly, second test immediately before packing.
  • 100% final inspection — visual and functional check on every single unit, plus batch capacity reports.
Certification: CE, FCC, CCC, MSDS and GB18287-2000 documentation is issued with quotations for qualified orders. Our business licence, production capacity and export data are verified by SGS under reference QIP-ASI251198.
Quality control flow
1. Incoming material screeningEvery batch of cells and components is checked for capacity, voltage and consistency when it arrives, before it is released to the line.
2. In-process monitoringOperators log output at each station — clipping, labelling and printing — so a deviation is caught at the station, not at the end.
3. First and second testingTwo testing stations on the line: a first test after assembly and a second test immediately before packing.
4. Pre-shipment inspectionFinished cartons are sampled for capacity, impedance and appearance. We keep material traceability records for every batch.
Verified data

Company facts, as audited

The figures below come from our SGS-verified supplier profile. They are the numbers we are prepared to be held to.

Production capability
Established2010 (export experience since 2020)
Facility size600 m²
Workforce50 employees
Production lines3 automated assembly lines
Machines20 units
Annual capacity600,000 pieces / year
Quality inspectors2 dedicated QA/QC staff on the line
Finished goods inspection100% — visual and function inspection
Raw material traceabilityYes — records kept
R&D / ODMIn-house R&D, ODM service available
Own brandYes — J-Rong
Nearest portsShenzhen Port, Guangzhou Port
SGS audit referenceQIP-ASI251198
Supplier rating5.0 / 5 · average response under 1 hour
Trade & shipping terms
IncotermsFOB, CIF, CFR, EXW
Payment termsT/T, L/C, D/P, PayPal, Western Union, small-amount payment
Lead timeWithin 15 working days (peak and off-peak season)
Minimum order200 pieces (50–100 pieces on selected lines)
Sample lead time3–7 days by DHL / FedEx / UPS / TNT / EMS
Courier partnersDHL, FedEx, UPS, TNT, EMS, HK EMS, HK Post
Bulk shippingSea freight, air freight or express — your choice of Incoterm
HS code8507600090
Facility

Facility

Our plant sits inside Beihai Science Park in Dali Town, Nanhai District — Foshan's manufacturing belt, one hour from Guangzhou.

Beihai Science Park — our factory campus
Beihai Science Park — our factory campus
Factory building, Dali Town, Nanhai
Factory building, Dali Town, Nanhai
Production

Production

Three automated assembly lines and twenty machines handle electrode processing, clipping, labelling and printing.

Producing department
Producing department
Automatic production department
Automatic production department
Sub-capacity workshop
Sub-capacity workshop
Electrode clipping station
Electrode clipping station
Labelling line
Labelling line
Printing / branding line
Printing / branding line
Quality Control

Quality Control

Two dedicated testing stations run on the line. Every unit gets a visual and functional check before it is boxed.

First testing station
First testing station
In-line testing
In-line testing
Testing department
Testing department
Second (pre-shipment) testing
Second (pre-shipment) testing
Warehouse

Warehouse

Incoming cells and components are screened and stored in a controlled material warehouse with traceability records.

Material warehouse
Material warehouse
Packing & Logistics

Packing & Logistics

Packing runs in three stations, and export cartons are prepared to dangerous-goods packing requirements.

Packing department
Packing department
Packing line
Packing line
Packing station 1
Packing station 1
Packing station 2
Packing station 2
Packing station 3
Packing station 3
Shipment / export loading
Shipment / export loading
Where our batteries go

Export markets

Serving distributors, wholesalers and brand owners worldwide.

RussiaIndiaSaudi ArabiaUnited Arab EmiratesNigeriaVietnamDomestic Chinaand worldwide

Send us your phone model list — get a quotation in 10 minutes

Tell us the models and the quantity. We will come back with FOB pricing, lead time and the shipping weight for your exact order. Free samples for qualified buyers.

Answers

Factory & compliance questions

What buyers ask before they book a factory visit or place a first order.

Are you a factory or a trading company?

We are the factory. Foshan Jurong New Energy Technology Co., Ltd. has manufactured lithium-ion phone batteries at Beihai Science Park, Dali Town, Nanhai District, Foshan since 2010. Our facility runs 3 automated assembly lines and 20 machines, and our capacity is verified at 600,000 pieces per year.

Which certifications do your batteries carry?

Our batteries are supplied with CE, FCC, CCC, MSDS and GB18287-2000 documentation, and our export packing complies with dangerous-goods regulations. Our business licence and production capacity are verified by SGS under audit reference QIP-ASI251198. Certificate copies are available on request with your quotation.

What are your payment terms and lead time?

We accept T/T, L/C, D/P, Western Union, PayPal and small-amount payment. Incoterms: FOB, CIF, CFR and EXW. Standard production lead time is within 15 working days for both peak and off-peak season, and we ship from Shenzhen or Guangzhou port.

How do you control quality?

Every unit is inspected — 100% visual and function inspection before packing. Incoming cells are screened on arrival, production is monitored in line, and finished goods pass a pre-shipment capacity and impedance test. We keep material traceability records and run two dedicated testing stations on the production line.

Call WhatsApp Email